Show Navigation
back to search results

UK - London - 2012 Olympic Aquatic Centre roof detail

2012 Olympic landscape showing Aquatics centre by Pritzker prize winner Zaha Hadid and main stadium at Stratford. The London Aquatics Centre has 2 50m swimming pools and a 25m diving pool. Built by Balfour Beatty for £242, three times the original cost. The aluminium roof is provided by Kalzip with cooperation from Rowecord Engineering and is 1,040 sq metre, weighing 3,200 tonnes.

Add to Cart Add to Lightbox Download
Filename
stratford_olympic18-08-03-2012.jpg
Copyright
© Richard Baker. All rights reserved. No copying, screen grabbing, watermark removal, transmission and no publication without permission from the author.
Image Size
3915x2609 / 864.9KB
www.photoshelter.com/support/license
https://www.bakerpictures.com/contact
stratford london east 2012 design olympic olympics site landscape contractor aquatics center centre facilities project renewal development legacy architecture close-up detail modernity modern lines roofing roof abstract pritzker prize winner zaha hadid kalzip rowecord engineering aluminium materials pioneering European Europe EU UK British Britain English England arena
Contained in galleries
2012 Olympic landscape showing Aquatics centre by Pritzker prize winner Zaha Hadid and main stadium at Stratford. The London Aquatics Centre has 2 50m swimming pools and a 25m diving pool. Built by Balfour Beatty for £242, three times the original cost. The aluminium roof is provided by Kalzip with cooperation from Rowecord Engineering and is 1,040 sq metre, weighing 3,200 tonnes.
Prev Next
Info
  • Facebook
  • Twitter
x

Richard Baker Photography

  • Archive
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area
  • Portfolio
  • About
  • Contact
  • Instagram
  • Twitter
  • Blog