Show Navigation
back to search results

UK - London 2012 Olympics - Olympic Velodrome and mobility landscape

A landscape of facilities and equipment outside the curved wooden roof of the iconic Velodrome during the London 2012 Olympics. The final bill for the 2012 Olympics could be ten times higher than the original estimate, according to an investigation. The predicted cost of the games when London won the bid in 2005 was £2.37billion. That figure has now spiralled to more than £12billion and could reach as much as £24billion, the Sky Sports investigation claims. The Olympics public sector funding package, which covers the building of the venues, security and policing, was upped to around £9.3bn in 2007. This land was transformed to become a 2.5 Sq Km sporting complex, once industrial businesses and now the venue of eight venues including the main arena, Aquatics Centre and Velodrome plus the athletes' Olympic Village.

Add to Cart Add to Lightbox Download
Filename
olympic_park39-10-08-2012.jpg
Copyright
© Richard Baker
Image Size
4197x2798 / 2.0MB
www.photoshelter.com/support/license
https://www.bakerpictures.com/contact
olympics olympiad olympic london 2012 park location place velodrome future locog legacy nobody no-one landscape shape designs design architecture venue velopark ioc sports sport facility facilities mobility equipment buggy spending costs budget brand logo rings transportation transport services service spectators event UK british britain english england & an a at of for with and in or
Contained in galleries
Olympiad, Olympics: Live
A landscape of facilities and equipment outside the curved wooden roof of the iconic Velodrome during the London 2012 Olympics. The final bill for the 2012 Olympics could be ten times higher than the original estimate, according to an investigation. The predicted cost of the games when London won the bid in 2005 was £2.37billion. That figure has now spiralled to more than £12billion and could reach as much as £24billion, the Sky Sports investigation claims. The Olympics public sector funding package, which covers the building of the venues, security and policing, was upped to around £9.3bn in 2007. This land was transformed to become a 2.5 Sq Km sporting complex, once industrial businesses and now the venue of eight venues including the main arena, Aquatics Centre and Velodrome plus the athletes' Olympic Village.
Prev Next
Info
  • Facebook
  • Twitter
x

Richard Baker Photography

  • Archive
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area
  • Portfolio
  • About
  • Contact
  • Instagram
  • Twitter
  • Blog