Show Navigation

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
{ 5472 images found }

Loading ()...

  • Due to works carried out by contractors on behalf of gas network SGN, plastic barriers block the pavement along Ferndene Road (correct spelling) in Herne Hill SE24, on 11th February 2019, in London, England.
    street_works-07-11-02-2019.jpg
  • Due to works carried out by contractors on behalf of gas network SGN, plastic barriers block the pavement along Ferndene Road (correct spelling) in Herne Hill SE24, on 11th February 2019, in London, England.
    street_works-06-11-02-2019.jpg
  • Due to works carried out by contractors on behalf of gas network SGN, plastic barriers block the pavement along Ferndene Road in Herne Hill SE24, on 11th February 2019, in London, England.
    street_works-04-11-02-2019.jpg
  • Due to works carried out by contractors on behalf of gas network SGN, plastic barriers block the pavement along Ferndene Road in Herne Hill SE24, on 11th February 2019, in London, England.
    street_works-03-11-02-2019.jpg
  • Due to works carried out by contractors on behalf of gas network SGN, plastic barriers block the pavement along Ferndene Road in Herne Hill SE24, on 11th February 2019, in London, England.
    street_works-02-11-02-2019.jpg
  • Due to works carried out by contractors on behalf of gas network SGN, plastic barriers block the pavement along Ferndene Road in Herne Hill SE24, on 11th February 2019, in London, England.
    street_works-01-11-02-2019.jpg
  • Due to works carried out by contractors on behalf of gas network SGN, plastic barriers block the pavement along Ferndene Road (correct spelling) in Herne Hill SE24, on 11th February 2019, in London, England.
    street_works-05-11-02-2019.jpg
  • Desaturated image of boarded up central London mini cab business and an End of works sign on street corner.
    no_work_cc01-22-11-2012.jpg
  • Desaturated image of boarded up central London mini cab business and an End of works sign on street corner.
    no_work_cc02-22-11-2012.jpg
  • A boarded up central London mini cab business and an End of works triangle sign on a Holborn corner.
    no_work03-22-11-2012.jpg
  • A Thames Water engineer rests in his van during repair works in Great College Street in Westminster, on 16th July 2019, in London, England.
    sleeping_engineer-03-16-07-2019.jpg
  • A Thames Water engineer rests in his van during repair works in Great College Street in Westminster, on 16th July 2019, in London, England.
    sleeping_engineer-01-16-07-2019.jpg
  • Construction worker and temporary works site landscape in Paddington, central London.
    construction_landscape02-03-03-2014.jpg
  • A curator inspects art canvasses leaning against gallery walls in the Royal Academy (RA) for its 'The Glory of Venice: Art in the Eighteenth Century' exhibition, a collection of important works of art by Italian artists such as Tiepolo, Canaletto, Piranesi, Piazzetta, and Guardi. In the privacy of the closed gallery, a lady official from the RA is bending down, resting her hands on knees and scrutinizing for possible damage after their removal from travel packing crates, whilst on the floor before hanging for public view. We see the largest picture on the right (Luca Carlevaris, The Bucintore Departing from S. Marco. 1710) of the Grand Canal in Venice and on the left is 'Domenico Tiepolo, The Institution of the Eucharist, 1753'. Polished wooden parquet flooring is protected by blocks that support the weight of each work of priceless art.
    RB_035-31-05-1994.jpg
  • Detail of a pit excavated for the upgrading of gas supplies works by contractors JDT on behalf of SGN, on 13th February 2019, in London, England.
    gas_hole-01-13-02-2019.jpg
  • A Closed Footpath sign fallen into a hole during pavement works in the south London borough of Lewisham.
    closed_footpath02-08-05-2015.jpg
  • A Closed Footpath sign fallen into a hole during pavement works in the south London borough of Lewisham.
    closed_footpath04-08-05-2015.jpg
  • Children play in a desolate street in the town of Nova Huta. Amid the filthy walls of their tenement building home and of the grim, car less street beyond, two older children play in their doorway while younger friends peer from around a corner. It is horribly depressing and unhealthy place to grow up and these children are pale and yet seem happy, with smiles on their faces. The famous steel works can be seen st the end of the street. After the war, Stalin decided to build an ideological communist fantasy just outside Krakow: a model town and immense steelworks of the future. The steelworks was named after Lenin and the town would be called Nova Huta. At its peak, 27,000 people worked at the Lenin Steelworks. But Solidarity grew strong forcing strikes over pay and recognition over their union. Today, it is an economic and ecological disaster area. .
    misc_poland06-06-09-2007.jpg
  • Construction worker secures fencing beneath yellow temporary works offices in central London.
    yellow_construction01-07-04-2011.jpg
  • Seen through the folded arm of a small excavator, two friends hug against the blue hoarding of Bond Street works.
    crane_kiss1-27-09-2011.jpg
  • A boarded up central London mini cab business and an End of works triangle sign on a Holborn corner.
    no_work02-22-11-2012.jpg
  • A boarded up central London mini cab business and an End of works triangle sign on a Holborn corner.
    no_work01-22-11-2012.jpg
  • Blurred passengers pass a workman occupies a small fence during works on the concourse by the platforms in Waterloo station.
    waterloo_works02-22-06-2012.jpg
  • A Thames Water engineer rests in his van during repair works in Great College Street in Westminster, on 16th July 2019, in London, England.
    sleeping_engineer-02-16-07-2019.jpg
  • Construction worker and temporary works site landscape in Paddington, central London.
    construction_landscape01-03-03-2014.jpg
  • Construction crew grind at the road surface surrounded by diagonals of red and white stripes of their works site.
    city_roadworks02-22-03-2012.jpg
  • Detail of a Southwark council sign attached to a Plane tree, warning of forthcoming tree works, on 28th November 2016, in Camberwell, south London borough of Southwark, England.
    camberwell_trees-03-28-11-2016.jpg
  • Detail of a Southwark council sign attached to a Plane tree, warning of forthcoming tree works, on 28th November 2016, in Camberwell, south London borough of Southwark, England.
    camberwell_trees-04-28-11-2016.jpg
  • A ladies' bicycle locked to a post, enclosed and blocked in during pavement replacement works in south London.
    blocked_bike01-04-07-2015.jpg
  • A ladies' bicycle locked to a post, enclosed and blocked in during pavement replacement works in south London.
    blocked_bike02-04-07-2015.jpg
  • A welder works high up from the ground from the safety of a hydraulic platform on the side of a lift shaft being constructed on a large development project on London Wall in the City of London, the capital's financial district - also known as the Square Mile. With the visor of his helmet lit by the glow from his acetylene torch, the man leans towards the detail of this close-up contact job. Oxy-fuel welding (commonly called oxyacetylene welding, oxy welding, or gas welding in the U.S.) and oxy-fuel cutting are processes that use fuel gases and oxygen to weld and cut metals, respectively.
    construction_welder07-14-03-2013.jpg
  • Temporary masking tape sticking works project plastic tape in London's Southbank.
    south_bank03-22-06-2012.jpg
  • A Closed Footpath sign fallen into a hole during pavement works in the south London borough of Lewisham.
    closed_footpath03-08-05-2015.jpg
  • A welder works high up from the ground from the safety of a hydraulic platform on the side of a lift shaft being constructed on a large development project on London Wall in the City of London, the capital's financial district - also known as the Square Mile. With the visor of his helmet lit by the glow from his acetylene torch, the man leans towards the detail of this close-up contact job. Oxy-fuel welding (commonly called oxyacetylene welding, oxy welding, or gas welding in the U.S.) and oxy-fuel cutting are processes that use fuel gases and oxygen to weld and cut metals, respectively.
    construction_welder02-14-03-2013.jpg
  • Children play near a puddle in the town of Nova Huta. In filthy industrial streets, the kids look undernourished in this scene of impoverished, Communist dereliction. It is horribly depressing and unhealthy place to grow up and these children are pale and yet seem happy, with smiles on their faces. The famous steel works can be seen reflected in the puddle before them. After the war, Stalin decided to build an industrial Communist fantasy just outside Krakow: a model town and immense steelworks of the future. The steelworks was named after Lenin and the town would be called Nowa Huta  - or, the new steel mill. At its peak, 27,000 people worked at the Lenin Steelworks. But Solidarity grew strong forcing strikes over pay and recognition over their union. Today, it is an economic and ecological disaster area..
    nova_huta_puddle01-20-06-1990.jpg
  • Construction hoarding and London cityscape showing the capital at The Pinnacle project on Bishopsgate in the City of London. Construction work has been suspended again on the Pinnacle in the City of London. Contractor Brookfield is understood to have been told to stop work following more funding concerns over the Square Mile's tallest tower. Brookfield restarted work last September after developer Arab Investments put together a new finance package. But a lack of a pre-let tenant has now caused further delays on site leaving Byrne Bros concrete cores standing idle. The Bishopsgate Tower, informally referred to as The Pinnacle, was to be a 288 m (945 ft), 64-storey skyscraper in the centre of London's main financial district.
    london_pinnacle05-07-02-2013.jpg
  • Construction in the capital where The Pinnacle project is on hold on Bishopsgate in the City of London. Construction work has been suspended again on the Pinnacle in the City of London. Contractor Brookfield is understood to have been told to stop work following more funding concerns over the Square Mile's tallest tower. Brookfield restarted work last September after developer Arab Investments put together a new finance package. But a lack of a pre-let tenant has now caused further delays on site leaving Byrne Bros concrete cores standing idle. The Bishopsgate Tower, informally referred to as The Pinnacle, was to be a 288 m (945 ft), 64-storey skyscraper in the centre of London's main financial district.
    london_pinnacle12-07-02-2013.jpg
  • Maintenance work is carried out in a London estate with statue artwork taped-off.
    work_statue01-19-08-2010.jpg
  • Construction in the capital where The Pinnacle project is stopped and on hold on Bishopsgate in the City of London. Construction work has been suspended again on the Pinnacle in the City of London. Contractor Brookfield is understood to have been told to stop work following more funding concerns over the Square Mile's tallest tower. Brookfield restarted work last September after developer Arab Investments put together a new finance package. But a lack of a pre-let tenant has now caused further delays on site leaving Byrne Bros concrete cores standing idle. The Bishopsgate Tower, informally referred to as The Pinnacle, was to be a 288 m (945 ft), 64-storey skyscraper in the centre of London's main financial district.
    london_pinnacle11-07-02-2013.jpg
  • Construction in the capital where The Pinnacle project is stopped and on hold on Bishopsgate in the City of London. Construction work has been suspended again on the Pinnacle in the City of London. Contractor Brookfield is understood to have been told to stop work following more funding concerns over the Square Mile's tallest tower. Brookfield restarted work last September after developer Arab Investments put together a new finance package. But a lack of a pre-let tenant has now caused further delays on site leaving Byrne Bros concrete cores standing idle. The Bishopsgate Tower, informally referred to as The Pinnacle, was to be a 288 m (945 ft), 64-storey skyscraper in the centre of London's main financial district.
    london_pinnacle09-07-02-2013.jpg
  • A machine operator gives the standard hand signal to a crane driver from inside enclosed equipment cleaning the stone work surfaces of an address in Aldwych WC2, on 2nd May 2019, in London, England.
    building_cleaners-02-02-05-2019.jpg
  • Business associates carrying work folders pass a construction hoarding featuring many faces and expressions.
    hoarding_faces11-17-10-2013.jpg
  • Pavement work and old corner shop in Stratford housing estate, adjacent to the 2012 Olympic site im east London.
    stratford77-14-10-2011.jpg
  • The large construction project known as the Pinnacle, on Bishopsgate in the financial City of London. Construction work has been suspended again on the Pinnacle in the City of London. Contractor Brookfield is understood to have been told to stop work following more funding concerns over the Square Mile's tallest tower. Brookfield restarted work last September after developer Arab Investments put together a new finance package. But a lack of a pre-let tenant has now caused further delays on site leaving Byrne Bros concrete cores standing idle. The Bishopsgate Tower, informally referred to as The Pinnacle, was to be a 288 m (945 ft), 64-storey skyscraper in the centre of London's main financial district.
    city_landscape09-30-01-2013.jpg
  • The large construction project known as the Pinnacle, on Bishopsgate in the financial City of London. Construction work has been suspended again on the Pinnacle in the City of London. Contractor Brookfield is understood to have been told to stop work following more funding concerns over the Square Mile's tallest tower. Brookfield restarted work last September after developer Arab Investments put together a new finance package. But a lack of a pre-let tenant has now caused further delays on site leaving Byrne Bros concrete cores standing idle. The Bishopsgate Tower, informally referred to as The Pinnacle, was to be a 288 m (945 ft), 64-storey skyscraper in the centre of London's main financial district.
    city_landscape08-30-01-2013.jpg
  • An excavator and aspirational poster on wall during building of 2012 Olympic Westfield City shopping centre, Stratford. A glamorous woman representing the good times - wealth and beauty and the symbols of affluence - while the working Man is seen small in comparison, the downtrodden Man. The £1.45bn complex houses more than 300 shops, 70 restaurants, a 14-screen cinema, three hotels, a bowling alley and the UK's largest casino. It will provide the main access to the Olympic park for the 2012 Games and a central 'street' will give 75% of Olympic visitors access to the main stadium so retail space and so far 95% of the centre has been let. It is claimed that up to 8,500 permanent jobs will be created by the retail sector..
    olympic_stratford31-15-03-2012.jpg
  • Construction work materials in the Pralongià above San Cassiano-St. Kassian in the Dolomites, south Tyrol, northern Italy. In winter, the Pralongià meadows are the heart of Alta Badia’s skiing area.
    piz_sorega06-17-07-2015.jpg
  • A workman operates a scissor lift beneath the large ceiling of a new development in Fenchurch Street, the heart of the capital's financial district. Surrounded by scaffolding and the sheeting from a nearby construction site facade, the man inspects work carried out by others from the safety and height of the scissor lift.
    city_architecture25-04-03-2013.jpg
  • Permit to Work and No Entry notices in construction barriers, in a south London street.
    work_fence01-07-10-2015.jpg
  • London city tour bus stopped at lights by construction work in central London.
    bus_roadworks09-21-05-2015.jpg
  • The front of the closed Carnegie Library in Herne Hill, on 20th December 2017, in the south London borough of Lambeth, , England. Shut by Lambeth council and occupied by protesters for 10 days in April, the library which was bequeathed by American philanthropist, Andrew Carnegie has been locked ever since because, say Lambeth austerity cuts are necessary even though 24hr security make it more expensive to keep closed than open for the local community. A gym that locals say they don't want or need is planned to replace the working library and while some of the 20,000 books on shelves will remain, no librarians will be present to administer it.
    carnegie_library-06-20-12-2017.jpg
  • London bus with side advert for Italian swimwear label Calzedonia, stopped at lights by construction work in central London.
    bus_roadworks06-21-05-2015.jpg
  • Regeneration construction work in Camberwell, south London.
    camberwell_regeneration05-17-08-2015.jpg
  • London Routemaster bus stopped at lights by construction work in central London.
    bus_roadworks08-21-05-2015.jpg
  • A wide panorama aerial landscape of London Docklands in 1991 looking east from a new apartment tower block on the Isle of Dogs. Rising tall is the new Canary Wharf tower (known as 1, Canada Square) soon after its completion - and before the subsequently extensive development phases. This docklands development in east London is the product of the 1980s financial boom when during the office of Prime Minister Margaret Thatcher, huge building projects such as the Docklands consortium saw vast changes in London's landscape. By 2012 Canary Wharf contained 14,000,000 square feet (1,300,000 m2) of office and retail space. Around 90,000 people work here and it is home to the world or European headquarters of numerous major banks, professional services firms and media organisations.
    docklands_aerial-06-06-1991.jpg
  • London bus with side advert for Italian swimwear label Calzedonia, stopped at lights by construction work in central London.
    bus_roadworks05-21-05-2015.jpg
  • The shadow of a crane is spread across the concrete surface of a lift shaft with their floors marked vertically at 5 Broadgate, designed by Make Architects which will become the new home of UBS in London when fully occupied. Rising towards the sky is the tower-like structure with blue numbers of future storeys, stencilled on to the grey reinforced concrete. There will be 12 floors to this office complex of 700,000 sq feet (66,890 sq m), scheduled to be completed in 2016. The City of London is the capital's historic centre first occupied by the Romans then expanded during following centuries until today, it has a resident population of under 10,000 but a daily working population of 311,000.
    construction_core05-14-03-2013.jpg
  • Woman sits alone working on writing on a city bench beneath spring blossom and roadworks barriers.
    blossom_roadworks03-15-03-2011.jpg
  • Lift shafts with their floors marked vertically at 5 Broadgate, designed by Make Architects which will become the new home of UBS in London when fully occupied. 700,000 sq feet (66,890 sq m). Rising towards the blue sky is the tower-like structure with blue numbers of future storeys, stencilled on to the grey reinforced concrete. There will be 12 floors to this office complex of 700,000 sq feet (66,890 sq m), scheduled to be completed in 2016. The City of London is the capital's historic centre first occupied by the Romans then expanded during following centuries until today, it has a resident population of under 10,000 but a daily working population of 311,000.
    construction_core02-14-03-2013.jpg
  • The shadow of a crane is spread across the concrete surface of a lift shaft with their floors marked vertically at 5 Broadgate, designed by Make Architects which will become the new home of UBS in London when fully occupied. Rising towards the sky is the tower-like structure with blue numbers of future storeys, stencilled on to the grey reinforced concrete. There will be 12 floors to this office complex of 700,000 sq feet (66,890 sq m), scheduled to be completed in 2016. The City of London is the capital's historic centre first occupied by the Romans then expanded during following centuries until today, it has a resident population of under 10,000 but a daily working population of 311,000.
    construction_core08-14-03-2013.jpg
  • Construction hoarding and London cityscape showing the capital at The Pinnacle project on Bishopsgate in the City of London. Construction work has been suspended again on the Pinnacle in the City of London. Contractor Brookfield is understood to have been told to stop work following more funding concerns over the Square Mile's tallest tower. Brookfield restarted work last September after developer Arab Investments put together a new finance package. But a lack of a pre-let tenant has now caused further delays on site leaving Byrne Bros concrete cores standing idle. The Bishopsgate Tower, informally referred to as The Pinnacle, was to be a 288 m (945 ft), 64-storey skyscraper in the centre of London's main financial district.
    london_pinnacle01-07-02-2013.jpg
  • Construction in the capital where The Pinnacle project is on hold on Bishopsgate in the City of London. Construction work has been suspended again on the Pinnacle in the City of London. Contractor Brookfield is understood to have been told to stop work following more funding concerns over the Square Mile's tallest tower. Brookfield restarted work last September after developer Arab Investments put together a new finance package. But a lack of a pre-let tenant has now caused further delays on site leaving Byrne Bros concrete cores standing idle. The Bishopsgate Tower, informally referred to as The Pinnacle, was to be a 288 m (945 ft), 64-storey skyscraper in the centre of London's main financial district.
    london_pinnacle14-07-02-2013.jpg
  • Construction in the capital where The Pinnacle project is on hold on Bishopsgate in the City of London. Construction work has been suspended again on the Pinnacle in the City of London. Contractor Brookfield is understood to have been told to stop work following more funding concerns over the Square Mile's tallest tower. Brookfield restarted work last September after developer Arab Investments put together a new finance package. But a lack of a pre-let tenant has now caused further delays on site leaving Byrne Bros concrete cores standing idle. The Bishopsgate Tower, informally referred to as The Pinnacle, was to be a 288 m (945 ft), 64-storey skyscraper in the centre of London's main financial district.
    london_pinnacle07-07-02-2013.jpg
  • Construction hoarding and London cityscape showing the capital at The Pinnacle project on Bishopsgate in the City of London. Construction work has been suspended again on the Pinnacle in the City of London. Contractor Brookfield is understood to have been told to stop work following more funding concerns over the Square Mile's tallest tower. Brookfield restarted work last September after developer Arab Investments put together a new finance package. But a lack of a pre-let tenant has now caused further delays on site leaving Byrne Bros concrete cores standing idle. The Bishopsgate Tower, informally referred to as The Pinnacle, was to be a 288 m (945 ft), 64-storey skyscraper in the centre of London's main financial district.
    london_pinnacle06-07-02-2013.jpg
  • Correct work identified on concrete ground on New York City construction site.
    tim_lynch251-23-05-2014.jpg
  • Seen through an aperture of a construction hoarding, workmen continue work within the grounds of St Paul's Cathedral where the new north entrance will be completed soon, on 26th October 2020, in London, England.
    st_paul's_hoarding03-26-10-2020.jpg
  • The large construction project known as the Pinnacle, on Bishopsgate in the financial City of London. Construction work has been suspended again on the Pinnacle in the City of London. Contractor Brookfield is understood to have been told to stop work following more funding concerns over the Square Mile's tallest tower. Brookfield restarted work last September after developer Arab Investments put together a new finance package. But a lack of a pre-let tenant has now caused further delays on site leaving Byrne Bros concrete cores standing idle. The Bishopsgate Tower, informally referred to as The Pinnacle, was to be a 288 m (945 ft), 64-storey skyscraper in the centre of London's main financial district.
    city_landscape10-30-01-2013.jpg
  • A machine operator gives a hand signal to a crane driver from inside enclosed equipment cleaning the stone work surfaces of an address in Aldwych WC2, on 2nd May 2019, in London, England.
    building_cleaners-04-02-05-2019.jpg
  • A machine operator gives a hand signal to a crane driver from inside enclosed equipment cleaning the stone work surfaces of an address in Aldwych WC2, on 2nd May 2019, in London, England.
    building_cleaners-03-02-05-2019.jpg
  • A machine operator gives the standard hand signal to a crane driver from inside enclosed equipment cleaning the stone work surfaces of an address in Aldwych WC2, on 2nd May 2019, in London, England.
    building_cleaners-01-02-05-2019.jpg
  • A dystopian landscape of construction materials and an inspirational view above the city - seen through a wire and netting street fence. Lettering on the hoarding tells us the scene below is inspirational, a capital from a new perspective. But the mess of aggregates and soil, tools and rubble tell a different story: an incongruous landscape of an idealised city and the reality of unfinished work.
    city_works05-15-04-2014.jpg
  • Workmen on a construcion site work beneath the concrete core of a new building being erected in the City of London.
    construction_site04-15-02-2013.jpg
  • The large construction project known as the Pinnacle, on Bishopsgate in the financial City of London. Construction work has been suspended again on the Pinnacle in the City of London. Contractor Brookfield is understood to have been told to stop work following more funding concerns over the Square Mile's tallest tower. Brookfield restarted work last September after developer Arab Investments put together a new finance package. But a lack of a pre-let tenant has now caused further delays on site leaving Byrne Bros concrete cores standing idle. The Bishopsgate Tower, informally referred to as The Pinnacle, was to be a 288 m (945 ft), 64-storey skyscraper in the centre of London's main financial district.
    city_landscape07-30-01-2013.jpg
  • Workmen on a construcion site work beneath the concrete core of a new building being erected in the City of London.
    construction_site02-15-02-2013.jpg
  • Workmen on a construcion site work beneath the concrete core of a new building being erected in the City of London.
    construction_site01-15-02-2013.jpg
  • An excavator and aspirational poster on wall during building of 2012 Olympic Westfield City shopping centre, Stratford. A glamorous woman sips a drink with a straw representing the good times - wealth and beauty and the symbols of affluence - while the working men are seen small in comparison, the downtrodden Man. The £1.45bn complex houses more than 300 shops, 70 restaurants, a 14-screen cinema, three hotels, a bowling alley and the UK's largest casino. It will provide the main access to the Olympic park for the 2012 Games and a central 'street' will give 75% of Olympic visitors access to the main stadium so retail space and so far 95% of the centre has been let. It is claimed that up to 8,500 permanent jobs will be created by the retail sector..
    olympic_stratford29-15-03-2012.jpg
  • Seen through an aperture of a construction hoarding, workmen continue work within the grounds of St Paul's Cathedral where the new north entrance will be completed soon, on 26th October 2020, in London, England.
    st_paul's_hoarding04-26-10-2020.jpg
  • Permit to Work and No Entry notices in construction barriers, in a south London street.
    work_fence03-07-10-2015.jpg
  • A shift of workmen working in Leicester Sq are amused at some Hare Krishna devotees who dance past singing.
    hare_krishnas1-01-11-2011.jpg
  • London city tour bus stopped at lights by construction work in central London.
    bus_roadworks04-21-05-2015.jpg
  • London city tour bus stopped at lights by construction work in central London.
    bus_roadworks01-21-05-2015.jpg
  • The front of the closed Carnegie Library in Herne Hill, on 20th December 2017, in the south London borough of Lambeth, , England. Shut by Lambeth council and occupied by protesters for 10 days in April, the library which was bequeathed by American philanthropist, Andrew Carnegie has been locked ever since because, say Lambeth austerity cuts are necessary even though 24hr security make it more expensive to keep closed than open for the local community. A gym that locals say they don't want or need is planned to replace the working library and while some of the 20,000 books on shelves will remain, no librarians will be present to administer it.
    carnegie_library-05-20-12-2017.jpg
  • The shadow of a crane is spread across the concrete surface of a lift shaft with their floors marked vertically at 5 Broadgate, designed by Make Architects which will become the new home of UBS in London when fully occupied. Rising towards the sky is the tower-like structure with blue numbers of future storeys, stencilled on to the grey reinforced concrete. There will be 12 floors to this office complex of 700,000 sq feet (66,890 sq m), scheduled to be completed in 2016. The City of London is the capital's historic centre first occupied by the Romans then expanded during following centuries until today, it has a resident population of under 10,000 but a daily working population of 311,000.
    construction_core09-14-03-2013.jpg
  • The shadow of a crane is spread across the concrete surface of a lift shaft with their floors marked vertically at 5 Broadgate, designed by Make Architects which will become the new home of UBS in London when fully occupied. Rising towards the sky is the tower-like structure with blue numbers of future storeys, stencilled on to the grey reinforced concrete. There will be 12 floors to this office complex of 700,000 sq feet (66,890 sq m), scheduled to be completed in 2016. The City of London is the capital's historic centre first occupied by the Romans then expanded during following centuries until today, it has a resident population of under 10,000 but a daily working population of 311,000.
    construction_core07-14-03-2013.jpg
  • The shadow of a crane is spread across the concrete surface of a lift shaft with their floors marked vertically at 5 Broadgate, designed by Make Architects which will become the new home of UBS in London when fully occupied. Rising towards the sky is the tower-like structure with blue numbers of future storeys, stencilled on to the grey reinforced concrete. There will be 12 floors to this office complex of 700,000 sq feet (66,890 sq m), scheduled to be completed in 2016. The City of London is the capital's historic centre first occupied by the Romans then expanded during following centuries until today, it has a resident population of under 10,000 but a daily working population of 311,000.
    construction_core04-14-03-2013.jpg
  • Woman sits alone working on writing on a city bench beneath spring blossom and roadworks barriers.
    blossom_roadworks01-15-03-2011.jpg
  • Southbank festival display with western tools propped up against showing Indian worker from developing world.
    works_poster02-22-06-2012.jpg
  • Southbank festival display with western tools propped up against showing Indian worker from developing world.
    works_poster04-22-06-2012.jpg
  • Ken, a gas worker's name, written on a trench and hole covering in a south London street.
    ken03-03-03-2015.jpg
  • London contractor workmen close construction site screens, showing a new development at Leicester Square for 2012.
    2012_renewal02-22-03-2012.jpg
  • London contractor workmen close construction site screens, showing a new development at Leicester Square for 2012.
    2012_renewal01-22-03-2012.jpg
  • At a road junction, contractors drag cables along underground channels in Railton Road, Brixton.
    road_works03-27-04-2010.jpg
  • Investigative Engineering Services, Assistant Commissioner Tim Lynch inspecting a new construction site in Manhattan, New York City.
    tim_lynch134-23-05-2014.jpg
  • Investigative Engineering Services, Assistant Commissioner Tim Lynch in his federal office on Broadway.
    tim_lynch546-24-05-2014.jpg
  • Two construction workmen manhandle a new post on Bishopsgate (Street) in the City of London, the capital's financial district.
    city_roadworks03-10-04-2014.jpg
  • A construction workman pushes a trolley across Bishopsgate (Street) in the City of London, the capital's financial district.
    city_roadworks02-10-04-2014.jpg
  • Investigative Engineering Services, Assistant Commissioner Tim Lynch inspecting a new construction site in Manhattan, New York City.
    tim_lynch151-23-05-2014.jpg
  • Investigative Engineering Services, Assistant Commissioner Tim Lynch on the roof of the federal NYC Department of Buildings on Broadway.
    tim_lynch518-24-05-2014.jpg
  • In strong sunlight, a workman delivers construction site fencing in the financial City of London's Threadneedle Street, crossing the road still wet after recent showers.
    city_streets41-31-01-2013.jpg
  • Incongruously odd landscape of traffic cones, striped tape and urban trees on construction site.
    street_works02-19-03-2012.jpg
Next
  • Facebook
  • Twitter
x

Richard Baker Photography

  • Archive
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area
  • Portfolio
  • About
  • Contact
  • Instagram
  • Twitter
  • Blog